Call Us Now

052 211 3546

Our Portfolio

Full office renovation.

Works included Painting, Creation of a Meeting room, creating a Gypsum partition to divide the utility area from reception, Parking Shade for Air Compressors, a full toilet, and kitchen material with new ones.
Client: Armoured Solutions
Location: DIC, Dubai

Full 08 bedroom Villa revocation in Khalifa City.

The main Majlis room has got water leakage thus the room wall got damaged. Work included removing the old paint and wall surface, putting a Special wall guard, re do the alignment and thus plastering and painting. The water damage was also prominent in other rooms, thus we had to apply the same treatment and redo the wall and paint.

Client: Private Client
Location: Khalifa City A, Abu Dhabi

Office Fit Out

Work included Wire pulling, full water sprinkle for the fire alarm system, all electrical sockets, and full electrical works. Also done were the Office room Glass facade and office suites.

Client: Proton Engineering
Location: Yas Island, Abu Dhabi

Water Tank and Outdoor Steel Ladder work

Work included water tank cleaning by using proper water tank chemicals. Also, had to redo the cooling system on the tank to make sure the water temperature remains usable.

The outdoor steel ladder had corrosion along with some structural damage. We did fix the damage and applied outdoor suitable paint

Client: Private Client
Location: MBZ City, Abu Dhabi

Villa Toilet and Outside Renovation Including Water Leak Issue in Washroom

Work Included outdoor damage to be fixed and re-painted as old paint fainted. Also did the New Car Park and outside exterior area by removing the old installations with the new ones.

Water leakage in the master bedroom toilet was a big challenge. Our expert team detected the fault and fixed it.

All 04 bathroom was renovated with the new system and re-painted as per client’s requirement.

Client: Private Client
Location: Al Bahiya, Abu Dhabi

Tile Works In KEZAD

Work Included new tile installation in one of the new office sets up.

Client: AD Ports
Location: KEZAD, Abu Dhabi

New Warehouse Set Up

Works Included the creation of office rooms and office setup for the team. Also included making a driveway for loading and unloading. Also painted and restructured the fixture that was damaged, along with the main entrance Glass and Aluminum works.

Client: Intelligent Transport and Contracting
Location: Musaffah M 39, Abu Dhabi

Shop Renovation

Work included setting up stock hangers along with the gate being pulled out and created at a new point, thus increasing the shop area. Re-do the damaged structure and apply new paints, along with the main entrance Glass and Aluminum works.

Client: Al Nada Sanitary Wares
Location: Musaffah M 40, Abu Dhabi

New Shop Work

Work included full electrical design, electrical wiring, load system installation, tiling, counter bench set up, Machinery area electrical points, bathroom, and kitchen work too, along with main entrance Glass and Aluminum works.

Client: Everyday Automatic Laundry
Location: Shabia 11, Abu Dhabi

New Shop Work

Work included full electrical design, electrical wiring, load system installation, tiling, painting, counter bench set up, electrical points works too along with main entrance Glass and Aluminum works.

Client: Towhid Typing and Photocopy and Its Branch
Location: Abu Dhabi City

New Shop Work

Work included full electrical design, electrical wiring, load system installation, tiling, counter bench set up, Machinery area electrical points, bathroom and kitchen works too, along with main entrance Glass and Aluminium works.

Client: Extreme Cleans Laundry
Location: Khalidiya, Abu Dhabi

Flat Renovation and Re do Damaged Structures

Re-done the kitchen tiles, bathroom tiles, and door works. Fixed with new tile, and re-done the damaged area with all new installations like WC, kitchen cabinets, room doors, etc.

Client: : Private Client
Location: Liwa Tower, Abu Dhabi City0000